Diploma Apply Structural Principles to Medium Rise CPCCBC508A: AT2 Portfolio Medium Rise - Drawings and Specifications, 1. Demolition of an existing structure on a medium rise building. · Provide all...

1 answer below »

    Diploma Apply Structural Principles to Medium Rise
    CPCCBC508A: AT2 Portfolio
Medium Rise - Drawings and Specifications,
    1. Demolition of an existing structure on a medium rise building.
    · Provide all the permits and documents needed for this to happen.
    · Explain Legislative requirements to be followed for safe demolition
    · Explain Planning requirements to be followed for safe demolition
    · Explain safe work practices to be followed for safe demolition
    2. Analyse Construction of a Medium rise building.
    · Document Demolition process and explain
    · Describe safe demolition practices
    · Research from plans and specs of what services are required here? (Plan been provided )
    · Materials being used for structural performance requirements (Research from plans and specs
    · Describe soil suitability and how to get the information.
    · Retaining wall/ structure to be implemented in construction process. What needs to be done
    · Any Bracing that needs to be temporarily required? Research from plans and specs
    3. Management and Construction of Footing Systems
    · Check footings for co
ect set out and compliance (explain the process and procedure)
    · Assess specified footings for compliance (what codes and standards and regulations relate to be acceptable)
    · Explain co
ect installation process.
    · Explain methods for provision of termite ba
ie
damp proofing
    · Explain process for checking and meeting compliance.
    4. Coordinating and managing structural elements of the construction process
    · List down the structural members and what they are from the plans/ documents provided.
    · Describe the process for ensuring compliance with installation of structural components.
    · Examine whether there is sufficient room for the require services and explain why.
    · Propose any potential problems or faults in the construction process (minimum 5 required)
    5. Organise meeting with Structural Engineer for construction of a retaining wall
    · Write an email to the Structural Engineer enquiring whether a retaining wall needs to be established due to the situation

Microsoft PowerPoint - Photo Review Option
Chisholm Tafe – Construction Technology
CPCCBC5018A - Apply structural principles to the construction of medium rise buildings
Photographic
Review & Annotation
Assessment
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
· Identify the main structural principles in the following photo’s
· List any specific requirements that would need to be considered for demolition of each photo.
· Utilise these photo’s to aide in your reports for this unit.
· You are required to provide only two of your own Commercial Building Photos in any class from 2 to 9, if using this Review Document
· Ask questions if there is anything you don’t understand
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #1
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #1 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #2
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #2 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #3
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #3 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #4
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #4 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #5
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #5 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #6
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #6 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #7
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #7 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #8
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #8 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #9
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #9 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #10
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo:
Photo #10 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #11 (Your Photo here)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo
Photo #11 (Your Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #12 (Your Photo here)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Add in here comments to the Photo
Photo #12 (Your Photo comments)

.o.w
o
w
il s
tre
et
eserve
cricklewood avenue
existing building
proposed building
EX. TREES &
LANDSCAPING
TO BE REMOVED
EX. PLAYGROUND,
SAND PIT & SHADE
SAILS TO BE REMOVED
PALING FENCE
TO BE REMOVED
EX. SHED
TO BE REMOVED
TUBULAR METAL FENCE
TO BE REMOVED
EX. CHAIN
MESH GATES
TO BE
RELOCATED
MODIFY EX. CHAIN
MESH FENCE & FORM
NEW OPENING FOR EX.
CHAIN MESH GATES
EX. BRICK
PIER TO BE
DEMOLISHED
NEW FENCE
CHAIN TO MATCH
EXISTING
EX. SHED
RETAINED
GENERAL NOTES
. These drawings are to be read in
conjunction with other drawings of the set.
No variation is to be made to the drawing
set without the prior approval of the
Proprietor and/or Architect.
. Builder to verify all dimensions before
commencing work. All dimensions to be
confirmed on site. This drawing is not to be
scaled.
. Ground levels indicated are approximate
only and must be confirmed on site prior to
commencement.
. All materials constructions etc. are to
comply with all relevant codes, by laws,
Building Code of Australia, etc.
. New construction to match existing where
applicable. All new floors to be at same
level as existing floors.
. Foundations, excavations, reinforcement
placement etc. to be inspected and
approved by the building surveyor prior to
any concrete placement.
. New concrete work is to comply with the
equirements of SAA code AS XXXXXXXXXX
and subsequent amendments - as
applicable.
. Structural framing to be in accordance
with AS 1684 Timber Framing Code.
. Stormwater to be connected to existing
system to approval.
. All glazing to be in accordance with AS
1288.
. Electrical layout in accordance with the
equirements of the local supply authority.
. Soil classification confirmed: refer to soil test
eport.
ARCHITECTURAL
16 Orwill Street, Frankston
Orwil St Community House Redevelopment
scale 1:400 (A3)
Site Plan
SCALE
DATE
DRAWN
CHECKED
FILE
RELEVANT DRAWINGS FIGURED DIMENSIONS TAKE PREFERENCE
ALL WORK SHALL CONFORM TO THE SPECIFICATION & OTHER
THIS XXXXXXXXXXDRAWING XXXXXXXXXXIS PROTECTED BY COPYRIGHT
APPROVAL BEFORE COMMENCEMENT OF ANY FABRICATION
SHOP DRAWINGS SHALL BE SUBMITTED TO THE GHP OFFICE FOR
OVER SCALED DIMENSIONS CHECK ALL DIMENSIONS ON SITE
PROJECT
DRAWING
PROPRIETOR
NOTES & ADDENDA
As indicated
01. 2575_och_wd_site.dwg
LEVEL 1, XXXXXXXXXXVICTORIA STREET NORTH MELBOURNE VICTORIA XXXXXXXXXXAUSTRALIA
Fax XXXXXXXXXX9 1
Tel XXXXXXXXXX1 1
Website www.ghp.biz
E-mail XXXXXXXXXX
.Greenway Hirst Page Pty Ltd .
.
U
an Design
Project Management
Environmental Design
Town & Regional Planning
Architecture
DATE REV
13.9.19
DETAIL
A Tender Readiness Issue
XXXXXXXXXX
BM
NP
JOB NO
C2575
DRAWING NO
WD01
REV
COVER SHEET
FRANKSTON CITY COUNCIL
ORWIL ST COMMUNITY
HOUSE REDEVELOPMENT
HYDRAULIC
ELECTRICAL
MECHANICAL
STRUCTURAL
16 ORWIL STREET, FRANKSTON VIC 3199
REFURBISHMENT WORKS TO EX.BUILDING
NEW WORKS
XXXXXXXXXXB Tender Issue
XXXXXXXXXXC Tender Addendum + Coordination Revisions
Issued for Construction ( Building Permit)
AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
EX. CHAIN MESH FENCE
AutoCAD SHX Text
TITLE BOUNDARY
AutoCAD SHX Text
EX. BARREL DRAIN
AutoCAD SHX Text
SEP
AutoCAD SHX Text
LPD:SEP
AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
-
AutoCAD SHX Text
WD16
AutoCAD SHX Text
GROUND FLOOR PLAN -
AutoCAD SHX Text
GROUND FLOOR PLAN SEWER
AutoCAD SHX Text
DEMO PLAN
AutoCAD SHX Text
SPECIFICATION - SHEET 3
AutoCAD SHX Text
SPECIFICATION - SHEET 2
AutoCAD SHX Text
SPECIFICATION - SHEET 1
AutoCAD SHX Text
H03
AutoCAD SHX Text
H02
AutoCAD SHX Text
H01
AutoCAD SHX Text
H04
AutoCAD SHX Text
H05
AutoCAD SHX Text
H06
AutoCAD SHX Text
E01
AutoCAD SHX Text
DRAWING,INDEX,LEGEND OF SYMBOLS
AutoCAD SHX Text
S05
AutoCAD SHX Text
S04
AutoCAD SHX Text
S03
AutoCAD SHX Text
S01
AutoCAD SHX Text
S02
AutoCAD SHX Text
GENERAL NOTES 1
AutoCAD SHX Text
GENERAL NOTES 3
AutoCAD SHX Text
FOOTING PLAN
AutoCAD SHX Text
FIRST FLOOR FRAMING PLAN
AutoCAD SHX Text
INTERNAL ELEVATIONS 1
AutoCAD SHX Text
SECTIONS 1
AutoCAD SHX Text
PROPOSED ELEVATIONS 2
AutoCAD SHX Text
PROPOSED ELEVATIONS 1
AutoCAD SHX Text
PROPOSED ROOF PLAN
AutoCAD SHX Text
REFLECTED CEILING PLAN/ PLAN DETAILS
AutoCAD SHX Text
PROPOSED GROUND FLOOR PLAN
AutoCAD SHX Text
EXISTING CONDITIONS / DEMOLITION PLAN
AutoCAD SHX Text
COVER SHEET / SITE PLAN
AutoCAD SHX Text
WD-11
AutoCAD SHX Text
WD-09
AutoCAD SHX Text
WD-08
AutoCAD SHX Text
WD-07
AutoCAD SHX Text
WD-06
AutoCAD SHX Text
WD-05
AutoCAD SHX Text
WD-04
AutoCAD SHX Text
WD-03
AutoCAD SHX Text
WD-02
AutoCAD SHX Text
WD-01
AutoCAD SHX Text
INTERNAL ELEVATIONS 4
AutoCAD SHX Text
INTERNAL ELEVATIONS 3
AutoCAD SHX Text
INTERNAL ELEVATIONS 2
AutoCAD SHX Text
WD-13
AutoCAD SHX Text
WD-12
AutoCAD SHX Text
INTERNAL ELEVATIONS 5
AutoCAD SHX Text
WD-14
AutoCAD SHX Text
DOOR / WINDOW SCHEDULE
AutoCAD SHX Text
WD-15
AutoCAD SHX Text
DETAILS 1
AutoCAD SHX Text
WD-10
AutoCAD SHX Text
CONSTRUCTION ISSUE
AutoCAD SHX Text
EXTERNAL WORKS
AutoCAD SHX Text
WD-16
AutoCAD SHX Text
GENERAL NOTES 2
AutoCAD SHX Text
S06
AutoCAD SHX Text
FOOTING DETAILS 1
AutoCAD SHX Text
S07
AutoCAD SHX Text
FOOTING DETAILS 2
AutoCAD SHX Text
S08
AutoCAD SHX Text
FRAMING DETAILS 1
AutoCAD SHX Text
S09
AutoCAD SHX Text
FRAMING DETAILS 2
AutoCAD SHX Text
S10
AutoCAD SHX Text
BRACING DETAILS
AutoCAD SHX Text
M03
AutoCAD SHX Text
M01
AutoCAD SHX Text
M02
AutoCAD SHX Text
LEGEND OF SYMBOLS
AutoCAD SHX Text
FLOOR PLAN DUCTWORK
AutoCAD SHX Text
SPECIFICATIONS
AutoCAD SHX Text
& EQUIPMENT LAYOUT
AutoCAD SHX Text
AND SPECIFICATION
AutoCAD SHX Text
E02
AutoCAD SHX Text
PROPOSED LIGHTING LAYOUT
AutoCAD SHX Text
E03
AutoCAD SHX Text
POWER & COMMS LAYOUT
AutoCAD SHX Text
E04
AutoCAD SHX Text
SCHEMATICS
AutoCAD SHX Text
ROOF PLAN -
AutoCAD SHX Text
H07
AutoCAD SHX Text
& SCHEDULES
AutoCAD SHX Text
& STORMWATER LAYOUT
AutoCAD SHX Text
WATER LAYOUT
AutoCAD SHX Text
SEWER & STORMWATER LAYOUT
foye
sitting kitchen
office 1 office 2 acc
wc
ex.wc
store
1
consult 3 consult 4
multi purpose
1
compute
child care
child wc
store
2
child
alcove
.o.w
EX.
SH
ED
TO
BE
RE
TAI
NE
D
PALING FENCE
TO BE REMOVED
TUBULAR METAL FENCE
TO BE REMOVED
EX. PLAYGROUND,
SAND PIT & SHADE
SAILS TO BE REMOVED
EX. VERAND
A & EXTERNA
L
SLAB TO BE
REMOVED
EX. CONC. RAMP
TO BE REMOVED
EX. TREES TO
BE REMOVED
EX.
Answered 8 days After Jun 16, 2022

Solution

Amar Kumar answered on Jun 24 2022
92 Votes
Microsoft PowerPoint - Photo Review Option
Chisholm Tafe – Construction Technology
CPCCBC5018A - Apply structural principles to the construction of medium rise buildings
Photographic
Review & Annotation
Assessment
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
· Identify the main structural principles in the following photo’s
· List any specific requirements that would need to be considered for demolition of each photo.
· Utilise these photo’s to aide in your reports for this unit.
· You are required to provide only two of your own Commercial Building Photos in any class from 2 to 9, if using this Review Document
· Ask questions if there is anything you don’t understand
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #1
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
foundation: A component of a structural system that anchors and supports a building's superstructure and transfers its loads to the ground. The bottom of the foundation needs to be below the frost level in order to protect it from repeated freeze-thaw cycles.
Photo #1 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #2
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Screeds are long, rigid, straight tubes or boards that are used to approximately level and smooth wet concrete right after it has been poured. Screeds come in a variety of sizes and are sometimes even project-specific, like those used to construct concrete
idges. In order to ride over the top edges of the form as the concrete is flattened during hand-screeding, the screed must be longer than the width of the concrete form.
A straightforward straight piece of dimension timber, typically a 2 x 4, works as a screed for many smaller projects including sidewalks, slabs for garages and driveways, and patios. Commercial screeds are also available; they frequently take...